Powerapps Portfolio
Home / Powerapps PortfolioThe application is developed using Power Apps (Canvas Apps), and it plays a crucial role in lab sample collection, allowing collectors to carefully record all details of assigned requests. This includes scheduling client visits, on-site specimen collection, and efficient courier management to laboratories. The mobile app ensures smooth tracking of specimen details, thorough expense tracking, and accurate documentation of requested assignments—whether completed or not.
- Powerapps Canvas App
- Dataverse
- Power Automate
- Azure Blob Storage
- Rest API
A solution in a form of a Canvas app which enables the users to share their injuries that can be covered up with the insurance being provided by the organization with a complex approval structure for the organization covering all the facets for the approval, its not complex for the user though
- Powerapps Canvas App
- Dataverse
- Power Automate
- Azure Blob Storage
- Rest API
An entire audit to analyze the process of project execution. It supports two types of incident reporting, i.e. minor or major where the forms/functionalities differ. A major incident report comes with 8 different stages which help the user to record the detailed level of an audit
- PowerApps Canvas App
- Dataverse
- SharePoint
- PowerBI
- Active Directory
- Custom Connectors
This PowerApps belongs to Construction company where they logs their construction site Inspection on daily basis. it includes features like, user login based on his current location, add inspection log for specific project including number trades, work progress images, issue images, create inspection log report, email report etc..
- Microsoft PowerApps
- Microsoft Flow
- MS SQL Server
- Azure Blob Storage
Paint Defect System with AI is an intelligent Microsoft Teams-based application designed to enhance the efficiency of identifying and addressing paint defects in trailers. By leveraging cutting-edge Azure Vision API technology, this app allows users to detect defects such as peeling, scratches, fading, cracks, and bleeding with unparalleled accuracy.
- Microsoft PowerApps
Trailer Inspection Application is an innovative Microsoft Teams-based solution designed to streamline and digitize the trailer inspection process. Built using PowerApps Canvas, Power Automate, and SharePoint, this application syncs seamlessly with your ERP system, ensuring real-time data synchronization and end-to-end inspection management.
- Microsoft PowerApps
From creating user accounts, assigning them their systems, and managing the payroll, this app has it all. It makes the process of the IT Manager, HR Manager, and the Staff Member Manager easier by providing a step by step function implementations along with assigning tasks to the teammates.
- Powerapps Canvas App
- Dataverse
- Power Automate
This Power Apps solution was designed and developed to address the challenges the client faced with the manual inspection and management of aeronautical parts. The solution streamlines the entire parts replacement lifecycle, from documenting the initial problem description and inspection details to procurement and replacement. It also helps identify the root causes and preventive measures to minimize the recurrence of similar issues in the future.
- Powerapps Canvas App
- Dataverse
- Power Automate
This is a leading construction company that specialises in building large-scale projects. We provide comprehensive solution that would allow them to manage their data and workflow effectively. Concetto Labs, a leading provider of PowerApps solutions, to implement PowerApps Canvas App, Model Driven App, SharePoint, MS SQL, and Dataverse.
- Construction Management PowerApps
- Powerapps Canvas App
- Dataverse
- Power Automate
PLC is an Model-Driven based application developed to cater the need of all the individuals associated with a construction based project, starting from pitching till maintenance, it contains all features to jot down the requirements along with the automations required at each step.
- Powerapps Model Driven
- Dataverse
- PCF Controls
- Power Automate
- Dynamics 365
An app that helps to automate the manual process of entering an storing all the records of the project being taken by a construction company. It is so detailed that a company with a turnover in billions can deploy this solution for an easy and quick way to manage their records.
- Powerapps Canvas App
- Dataverse
- Power Automate
- Azure Blob Storage
- Rest API
Easily manage your expenses while you are on a business trip and get it approved by your managers. This app provides an entire hierarchy of the user management along with email approvals of the expense reports added by the employees making the reimbursement process easier.
- Powerapps Canvas App
- SharePoint
- Power Automate
An application that allows the users to manage the scope of work, NDAs, along with adding and managing the projects based on multiple technologies. Automation allows each reports to be sent to the customer
- Powerapps Canvas App
- Dataverse
- Power Automate
A solution in terms of an application was in need by one of our clients who were already using the Microsoft ecosystem to manage their employees. They were not having a centralized way of managing their inventory and were doing it via the Google sheets which was becoming tedious as their business expanded.
- Inventory Management App
- Order Management App
- Stock Management App
Construction workers and the engineers always need the acceptance criteria to be fulfilled at the end of the day so that there’s no mistake in any area which can end up with some mishap. This app is one of the lightest app that aims to capture the images from the tabs assigned to the worker or engineer to keep a image log of the work done
- Daily Reporting
- Construction App
- Reporting App
This app was aimed for a trading company located at Chile and Chicago who wanted to manage the list of their customers along with their orders for the day to day trades of stocks whether it be selling, purchasing or putting them on hold. It gives the access to 4 roles of the company's hierarchy where there are some employees handling the end customers, some are managing the trades, some at verification desk and a handfull at management. Trade Management app also gives the admin the authority to check the customer's trade history by just putting up their name or ID along with managing the roles of the employees
- Microsoft PowerApps
- Sharepoint List
- Microsoft Flow
This app enables employees to create, view, and manage timesheets, with features like new timesheet creation, submission, and report generation. Managers can approve/reject timesheets, manage approvals, and view team reports. The app also includes a support system and integrates PowerBI for analytics.
- Powerapps Canvas App
- Dataverse
- Power Automate
- Azure Blob Storage
- Rest API
The idea behind this app was to build an app for the client and his team to manage their construction workers' vendors in an effective way. To assign the person from the company who will be taking care of the work to be allotted to each vendor using this app and manage the ratings and reviews for their jobs so that they can use them again for future projects.
- Microsoft PowerApps
- Microsoft Flow
- MS SQL Server
- Custom Connector
We were supposed to help the client with changing his entire manual work into an automated platform where he could run his business. The job was to provide the client with a Powerapp where he can assign the work to his team for installing cables after surveying the area, materials and cost required for each component which were dynamically specified for the admin. The worked can just get the PDF (HTML to PDF conversion) for all the estimation and install the cable according to the survey made.
- Microsoft PowerApps
- Microsoft Flow
- MS SQL Server
This PowerApps is about to create a job order for the received pump. It logs various angle’s information & images about the pump part received for the repair. It includes reports like As Found & As Built.
- Microsoft PowerApps
- Microsoft Flow
- MS SQL Server
This PowerApps is about to fill daily questionnaire for specific job site and based on answers it creates work orders and email notifications for responsible person.
- Microsoft PowerApps
- Microsoft Flow
- MS SQL Server
This PowerApps is about to collect customer contact details when they visit your office. It is connected with multiple Databases.
- PowerApps
- Microsoft Flows
- SharePoint
- MS Access
- WEB API
- MS SQL Server
This PowerApps is about to view SharePoint document library. It just list out all documents library from SharePoint. Clicking on specific document from the list, will open complete document as a preview. This applies to all kind of documents.
- PowerApps
- Microsoft Flows
- SharePoint
Hear It from Our Clients Themselves
Our clients share their experiences of working with us to build reliable digital solutions that address real business needs. Explore their feedback to learn how our team helps businesses improve processes, adopt the right technology, and turn ideas into successful solutions.
Sonat Yalcinkaya
Founder & CEO of Soyaka"I am the founder and CEO of the Shox application and Soyeka AI.I've been working with the Concetto Labs team for about two years at this point. They have worked with us in a very productive, supportive, and collaborative manner ever since day one. I appreciate you talking with me."
James Mukabi
Founder & CEO of Kgalagadi Pharmacy"I'm James Mukabi from Botswana, and I'm a happy customer of Concetto Labs.In order to create our new medicine delivery app, we built Concetto Lab.I discovered the Concetto Labs crew to be highly professional and knowledgable about their job when we were developing the app. The crew is welcoming, they listen to you, and they walk you through each step as the project takes shape. Finally, I can attest that the product was precisely what we had envisioned."
Kevin Cooper
Founder & CEO of Skrachy"I am the creator and CEO of Scratchy, a DJ-focused digital streaming platform.About 2.5 years ago, I approached the Concetto Labs team with nothing more than an idea and a vision.The team at Concetto Labs was able to implement that notion & goal.A streaming platform by the name of Scratchy also has a built-in marketplace, an advertising engine, and a mobile app.Without the Concetto Labs team's devotion & commitment, I'm not sure how I would have been able to do this."
Francesco Defazio
Founder & CEO of HoliSoft"My company is a software house, but we have no expertise in web development.We have been working with Concetto Labs for two years.We are very happy with our collaboration because they are very efficient, fast, and also have excellent graphic solution.Thank you, Concetto Labs."
Andres
Project Manager at Fennix Global"These are a few justifications for choosing Concetto Labs for your upcoming website project.They are quick implementation timeframes, capable & accommodating customer service, and frequent meetings that facilitate seamless project progress.Concetto Lab provide a strong foundation that will meet our demands for a number of years.For anyone searching for solutions for website development, I heartily suggest them."
Mercy Nyamangwanda
Founder & CEO of KAI App"My name is Mercy. I am the owner of the Kai app, and I had the chance to collaborate with Concetto Labs to have this fantastic software made for me.Because I had the finest experience, I would give it a five out of five. It was always excellent, quite professional, and the software was well-liked.And if I were to work with them again, I'd suggest Concetto Labs to anyone looking to download or make apps."
Stephen Joseph Donohue
Founder of True Serendipity PTY LTD"Hi, guys. My name's Donohue. I work from the Gold Coast in Australia. I've been developing SaaS apps now for a year or so, generally through base44. My most recent apps are Freelance Synergy and Smallbiz AI Solutions. I've also produced a WordPress blog from Smartbiz Metrix, which I've also created. The Freelance Energy and Small Biz AI were Developed and QA by Rahul and Gaurav from Concetto Labs. These guys are just brilliant. They're so easy to work with. They've done a wonderful job. I couldn't recommend them enough. They're always there when I need them. Even if one particular project is finished and something goes wrong with it, I give them a call and they fix it for me instantly. So highly recommended. I definitely will be using them again, and I suggest you do as well."
Let’s Connect
Reach out for inquiries, partnerships, or support. Our team is ready to assist you.
YEARS OF EXPERIENCE
TECHNOLOGY EXPERT
CLIENT RETENTION RATE
MOBILE APP DEVELOPED
HAPPY CLIENTS
WEB APP DEVELOPED